The tool draws, classifies, records, validates and exports. That is the full scope. Everything outside that scope is still your job.
It will not tell you whether your future state design is a good one. A map that validates cleanly against BPMN 2.0 is structurally correct. Structural correctness says nothing about whether the design will work in your organisation, with your systems, under your workload.
It will not verify your time figures. Whatever process time and wait time you type in is what the tool uses. If the figures are optimistic, the map will be optimistic and will look entirely credible while being wrong. The tool has no way to check your numbers against reality.
It will not settle value classification disputes. It records the classification you choose. If your team cannot agree on whether a review step adds value, the tool will accept either answer without comment.
It will not manage the change. Drawing the future state is a small part of reaching it. Training, system configuration, role changes, policy updates and the ordinary resistance of busy people all sit outside this screen.
It will not keep itself current. A To-Be map is accurate on the day you draw it. Processes drift. Unless someone owns the map and updates it, it becomes a historical record of an intention rather than a description of how work is done.
Finally, the AI review explains the map. It does not approve the design, carry accountability, or know anything you did not draw. Read it, weigh it, then make the call yourself.