Process Redesign will not tell you whether your diagnosis was right. Every row inherits the quality of the Analyse phase that preceded it. If the cause was wrong, the worksheet will describe a well-formed change to the wrong step, and nothing in the output will warn you.
It will not validate your benefit figures. Cycle time down 23 minutes, error rate down 27 percentage points, match time down 14 minutes and approval delay down 3 hours are estimates you entered. The tool arranges them. It does not check them against data, and it does not test whether they are achievable. Treat every one of them as a hypothesis the pilot exists to confirm.
It will not cost the change. There is no field for implementation effort, licence cost, training load or lead time. A row that saves 14 minutes and a row that saves 3 hours look equally weighted on the page even if one takes a week to build and the other takes six months. You need a separate costing conversation before you choose what to pilot.
It will not sum the benefits for you, and you should be cautious about doing that yourself. The time figures mix handling time with elapsed delay, and the quality figure is in a different unit entirely. Adding them produces a headline number that misrepresents all three.
Finally, it will not manage the change. Documented process logic is necessary and not sufficient. People have to be told, trained and supported, and the exception queue has to be staffed. The worksheet gives you the design. The rest of the Improve and Control phases give you the adoption.