It will not tell you whether 90 is the right target. The flat 90 in the sample is an input you supply, not an output the tool derives. The chart will draw whatever line you type.
It will not tell you how to move the work. Shifting 35 per cent off Monday and adding 50 per cent to Tuesday requires a mechanism, which might be scheduling, order release, a buffer or a conversation with whoever sends the work. None of that appears in the worksheet.
It will not price the change. There are no cost, hours or savings figures here. The per bucket percentages tell you how far the load moves, not what the movement is worth. If you need a business case, you build it alongside this, using the movement as the input.
It will not prove the gain is real. The comparison is between an observed pattern and a proposed one. Only a pilot produces evidence. Treat the output as a sized hypothesis that is worth testing, and carry it into Control with the measures already named.
Finally, it will not fix a capability problem. If the process produces defects at 85 units a day, it will produce them at 90. Levelling smooths arrival. It does not change what happens once the work arrives.